Consisting of two interconnected asphalt pump tracks with both tracks being 122 LM. Track 8a included approx. 52 LM of asphalt track. Track 8b consisted of 110 LM of asphalt track. Based off of the specifications from the City, GPM provided the design drawings to accompany this concept plan.